Gravel Driveways

Gravel grids vs loose gravel: which is best for your driveway?

Updated 6 November 2026 · By the Gravel Driveways team

Short answer: Loose gravel over a compacted sub-base is the cheapest way to build a gravel driveway and works well on flat, lightly used drives. Gravel grids cost more, typically £20 to £50 extra per square metre, but they stop stones migrating and rutting, make the surface firmer to walk and wheel on, and are the better choice for slopes, busy drives and drives that meet a pavement.
Gravel grids vs loose gravel: which is best for your driveway?

Side-by-side comparison

Loose gravelGravel grids
Typical extra costNone£20 to £50 per m²
Rutting and potholesCan develop over timeLargely prevented
Gravel spreadingCommon, especially near the roadStones held in cells
Walking, wheelchairs and buggiesHarder goingFirmer and easier
SlopesGravel drifts downhillMuch more stable
MaintenanceRegular raking and top-upsLess raking, fewer top-ups

When loose gravel is right

  • Flat drives with light use
  • Large rural drives where cost per square metre matters most
  • Drives set well back from the road

When gravel grids are right

  • Sloping drives
  • Drives used by several cars every day
  • Drives next to a pavement or road
  • Homes where someone uses a wheelchair, walker or buggy
  • Turning areas where tyres twist and scuff the surface

What goes under both

Grids are not a substitute for a proper base. Both loose gravel and grid systems need a dug-out area, a compacted sub-base sized for the vehicles using it, and a membrane to separate the stone from the soil and keep weeds down.

Related guides

Need a quote? We cover 250 towns and cities across England, Scotland, Wales and Northern Ireland.